Hi everyone, this is my first time posting here.
I'm evaluating a site (in the US) for a medium-size 200-250 KW wind project I'm going to propose. I am generally familiar with renewables and navigating the policy landscape, but not as well-versed in the technical and engineering aspects of the grid and electricity transmission.
I'm trying to determine what the transmission needs for this amount of generation would be, and if my region has sufficient infrastructure, or if upgrades or additional lines will be necessary.
Would anyone be kind enough to point me in the right direction for where to start?
Specifics about what I need to find out would be great, as well as if you have experience with medium size wind.
Thanks a bunch!
Cody