News:

Welcome to the 'Renewable Energy Forum' - Here you can ask any questions you like to a large panel of industry professionals and like-minded enthusiasts. Or simply search the forum for existing answers to your questions, and chat freely with your peers in our friendly community.

Main Menu

3 Phase 300W Turbine

Started by JohnB, September 01, 2019, 08:51:37 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

JohnB

I have a 300W 3 phase wind turbine, the electrical cables are colour coded, I also have a rectifier that came with the wind turbine (Pics attached).

Grateful if anyone could assist with the following: Can I dismiss the rectifier that came with the turbine and connect the 3 cables directly into the ista breeze Hybrid controller or would I have to go through the rectifier first and then connect it to the Hybrid controller

JonMcGarry

I cannot see the pic's attached , if you have 3 connections on the istabreeze controller then it has a rectifier built in usually this would be the case.
what sort of turbine do you have ?