Legal & Planning permission in Scotland

All roof-mounted wind turbines require planning permission in Scotland. For pole-mounted turbines, planning permission will be required unless the property meets the following criteria:

  • The wind turbine must be the only one on the property
  • The turbine must be situated more than 100m from the boundaries of another property
  • The turbine must not be located in a Conservation Area, World Heritage site, area of scientific interest, or within the grounds of a listed building

Further planning permission details for Scotland are available here:

Press Esc to close
Press Esc to close