Good morning all

I am new to this forum as well as to renewable energy. I want to install a Vertical Axis Wind Turbine on my land and need the following information.
I want to be On Grid but not export any energy as the units I am buying are not MCS certified. Just some of them.
I am looking to install a VAWT 3kw using a charge controller with 6kw resistor as well as PLC Hydraulic brake system.
The inverter to be a 3 phase Hybrid Inverter from Deye Sun at 10 - 12 kw.
The batteries I am not sure yet but I was looking at Fogstar 64.4 kwh.

The questions I have are:
Will I be able to run both houses at 100A each and how would I need to set this up?
Do I need more then one inverter?
I wanted one phase to go to one house the other to the second house and also have a 3 phase connection for some things.
Can this work?

Thx for any advice you have

Ian